01 / STRUCTURAL ENGINEERING
Understand the crossing.
The bridge purpose, span configuration, traffic conditions, ground conditions and surrounding constraints all shape construction methods.
Foundation conditions
Traffic management
Access and staging
Structural systems
02 / STRUCTURAL ENGINEERING
Coordinate design and buildability.
Construction sequencing, temporary works and material movement require technical coordination with the design and project teams.
03 / STRUCTURAL ENGINEERING
Organize quality evidence.
The project quality plan should address inspections, test requirements, material records and completion documentation.
